Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13707613

- Product Categories
- Friendly Links
Information Name: | Deng County power distribution cabinets _ Teflon (certified) _ distribution cabinet |
Published: | 2015-05-15 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Teflon high and low voltage distribution cabinet test (6) cabinet (disk) Test Adjustment 1) high-voltage test by test unit of the local electricity sector be approved. Test standards in line with national norms, regulations of the local electricity sector and product technical information requirements. 2) Test Content: High cabinet frame, bus, surge arresters, high voltage insulator, voltage transformers, current transformers, various types of switches. 3) Adjust the content: overcurrent relays adjust Nanyang distribution cabinets price, time relays, signal relay adjustment and mechanical linkage adjustment. 4) Secondary control small line adjustment and simulation, all the wiring terminal screws to tighten once again. 5) Insulation Test: 500V insulation resistance tester to test the resistance of each loop at the terminal board of the power distribution cabinet, the resistance must be greater than 0.5MΩ. 6) the second small wire loop if transistors, integrated circuits, electronic components, should be used multimeter test circuit is switched on. 7) Turn on temporary control power and operating power; the control cabinet (disk) within the upper end of the operation phase power supply circuit fuse removed, connect temporary power. 8) simulation: by drawing, respectively, simulation control, chain, operations, and signal relay action, correct, sensitive and reliable. 9) Remove the temporary power supply, power cord will be removed Nanyang Teflon power reset on electrical test after the installation personnel after wiring is completed, we will have a professional tester for testing electrical cabinet to ensure that the control cabinet can each function normal use. Nanyang distribution cabinet during the test over and over again, at least two test personnel to work together in the front of the electrical tests required in accordance with the wiring diagram testers use a multimeter to check the wiring is correct, then the electrical testing to lower component damage rate. After power-control requirements under the project test each point is action, is able to work properly. Testers manually add alarm signal test the alarm system is working properly. In the power-testing and debugging, all testers have unity of action coordination, a threat is found to take timely measures. Deng County power distribution cabinets _ Teflon (certified) _ distribution cabinets provided by Nanyang Fu Long Electric Power Engineering Company Limited. Nanyang Fu Long Electric Power Engineering Co., Ltd. (www.nyfulong.com) is Nanyang, Henan, transmission equipment and materials leaders, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. Teflon power in leadership with the staff warmly welcome all inquiries negotiations to create Teflon electricity better future. |
Admin>>>
You are the 16410 visitor
Copyright © GuangDong ICP No. 10089450, Nanyang Fulong Power Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 16410 visitor
Copyright © GuangDong ICP No. 10089450, Nanyang Fulong Power Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility