Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13707613

- Product Categories
- Friendly Links
Information Name: | Nanyang Nanyang transformer transformer construction process _ _ Teflon electricity |
Published: | 2015-04-24 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanyang Teflon transformer installed correctly install the transformer is to ensure that one of the important conditions for the safe operation of the transformer installed in the main transformer substation transformer Nanyang sales, according to the site conditions can be grouped into six types, namely outdoor substation, indoor substation, underground substation, mobile substation, box-type substation transformer and outdoor Compact and modular substation. distribution transformers installed in different ways, but it can be summed up can be divided into indoor and outdoor two categories, called indoor Nanyang transformer maintenance program distribution room, outdoor rod rack, Taiwan pier (station house) and floor (floor) style. Nanyang Teflon overhaul of power transformers on-site conditions and process requirements 1) crane bell (or control body) are generally advised in the room, to keep the body of the cleaner; Nanyang transformer test run, to be elected as in the open air during a sunny day; does not exceed the air relative humidity less than 75% 12h;; no more than when the air relative humidity less than 65% 16h exposure time when the body of transformer oil discharge is calculated from the beginning until the smoke: the body is exposed to the air in time to make the following provisions Vacuum up. 2) In order to prevent the body of condensation, the body of the temperature should not be lower than the ambient temperature, otherwise the application vacuum oil circulating heating oil, transformer heating, the body temperature is higher than the ambient temperature is above 5 ℃. 3) Check the body of the person shall be conducted when the dress code compliance. Lighting should be safe voltage. Allowed on the ladder against the coil or wire, workers may not stampede coil and leads. 4) Check the body of the person using the tool should be kept and the registration number, left in the tank to prevent or control the body; the job should be considered in the box ventilation. Nanyang Nanyang transformer transformer construction process _ _ Teflon Teflon electricity provided by Nanyang Electric Power Engineering Company Limited. Nanyang Fulong Power Engineering Co., Ltd. (www.nyfulong.com) strong, credible, Nanyang in Henan transmission equipment and materials industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead the Teflon power and you hand into the brilliant, for a better future! |
Admin>>>
You are the 16410 visitor
Copyright © GuangDong ICP No. 10089450, Nanyang Fulong Power Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 16410 visitor
Copyright © GuangDong ICP No. 10089450, Nanyang Fulong Power Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility