Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13707613

- Product Categories
- Friendly Links
- home > Supply > Nanyang distribution room installation specifications | Nanyang distribution room | Nanyang distribution room Teflon most professional installation
Nanyang distribution room installation specifications | Nanyang distribution room | Nanyang distribution room Teflon most professional installation
Information Name: | Nanyang distribution room installation specifications | Nanyang distribution room | Nanyang distribution room Teflon most professional installation |
Published: | 2015-04-22 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Design requirements for a power distribution room, door width 2.0 meters, 2.7 meters high, 1.5 meters wide windows, from not less than 1.8 meters high, catchy flush doors, steel windows, a glass a yarn. 2, the interior floor and cable trench cover using concrete surface form. 3, power distribution room door with open outwards. 4, interior height of 0.3 meters, the wall 240 mm. 5, the distribution of indoor installation of lighting distribution box tool cabinet Nanyang distribution room, sockets and wall lamps, twin-tube fluorescent emergency fixed atop the cast. 6, transformer room, power distribution room, capacitors room should be set up to prevent rain, snow and snakes, rodents small animals from light windows, hopper windows, doors, cable trench into the interior amenities. 7, substation, substation cable sandwich, cable channel and cable room, take water, drainage measures. 8, high voltage power distribution room and capacitors room, should be established natural light window can not be opened, under the windows from the outside along the ground height of not less than 1.80m. Street side windows should not be. 9, transformer room should adopt natural ventilation, exhaust temperature is not higher than summer 45 ℃, inlet and exhaust temperature should not be greater than 15 ℃. 10, was on duty in the distribution substation, should be provided on the water facilities. 11, distribution channel should be smooth interior, shall set the threshold. 12, when the trench under high voltage switchgear has Nanyang distribution room price, trench depth should consider the cable bend radius and the number of cables, usually 1.0 ~ 1.5m, a width of not less than 0.8 ~ 1.0m, while features can enter the When the cable sandwich, its clear height of not less than 1.8m. 13 distribution room design requirements, low voltage power distribution room, dry-type transformer room, high-voltage power distribution room vacuum breaker breaker or unfired medium and low voltage dry-type capacitors room, not less than three. Roof load-bearing components should be two. 14, low voltage power distribution room, oil-free high-voltage power distribution room, dry-type transformer room and control room duty room doors, fire doors should not be less than the standard B's. 15, the door should be fitted between the substation of the room to open the door for two-way or open to the low pressure side. 16, with a substation doors open to the outside, the windows are to be provided with anti-rain, snow and other small animals into the room and facilities. 17, transformers and distribution equipment room door width and height, should be added to the external dimensions of the largest piece of transport 0.3 m. 18, with each room on the ground substation should adopt high-grade cement plaster calendering or terrazzo floors, ventilation requirements of the transformer room and capacitors room, elevated floor plan should be adopted, transformer room on the ground should have a slope through the middle Tunnel 2% slope. 19. The distribution between the door should open outwards, not less than the standard B's fire doors. Distribution between the walls should be not less than the fire resistance of non-burning body 1h. 20, indoor cable trench cover and interior floor to be flat, easy water fouling in place, it is appropriate to cover the asphalt cement mortar or plaster die. 21, cable channel waterproof measures should be taken. The bottom should be done no less than 0.5% of the vertical drainage slope and set sump (well), water discharge, conditions can be directly discharged into the sewer district Nanyang distribution room service, the absence of such conditions, then by sump pump discharge. 22, cable laying on the multilayer stent is located at the bottom of the high-voltage cables, low voltage cable on the top layer. 23, laying cables in the trench, the length of the stent should not be greater than 350mm. 24, as described below 10kV substation and power distribution room design specifications GB50053-94 Nanyang installation specifications |. Nanyang distribution room | Nanyang distribution room Teflon most professional installation is provided by Nanyang Fulong Power Engineering Company Limited. Nanyang Fulong Power Engineering Co., Ltd. (www.nyfulong.com) strong, credible, Nanyang in Henan transmission equipment and materials industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead the Teflon power and you hand into the brilliant, for a better future! |
Admin>>>
You are the 16410 visitor
Copyright © GuangDong ICP No. 10089450, Nanyang Fulong Power Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 16410 visitor
Copyright © GuangDong ICP No. 10089450, Nanyang Fulong Power Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility