Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13707613

- Product Categories
- Friendly Links
Information Name: | Teflon power (Figure) _ _ Nanyang Nanyang transformer installed transformer |
Published: | 2015-04-22 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanyang Teflon transformer installed correctly install the transformer is to ensure that one of the important conditions for the safe operation of the transformer installed in the main transformer substation, according to site conditions can be grouped into six types, namely outdoor substation, indoor substations, underground substation The mobile substation, box-type substation transformer and outdoor Compact and modular substation. distribution transformers installed in different ways, but it can be summed up can be divided into indoor and outdoor two categories, known as the distribution room interior Nanyang transformers, outdoor rod rack, Taiwan pier (station house) and floor (floor) style. Nanyang Teflon drop-out fuse power transformers, high-mounted transformer fuse switches, low-side lead wires should be installed separately Nanyang transformer fuse installed in order to protect and facilitate the distribution transformer switching transformer. High side install drop-out fuse, fuse perpendicular to the bottom surface height of not less than 4.5m, the phases of the fuse horizontal distance of not less than 0.5m, in order to facilitate the operation and after fuse blown fuse tube can smoothly falling down, drop-out fuse axis should be perpendicular to the ground line to 15. ~ 30 ~ inclination. Fuse switch at the bottom of the low pressure side of the vertical height of the ground is not less than 3.5m, the horizontal distance of each phase fuse blade is not less than 0.2m, the axis of the blade fuse should be perpendicular to the ground line to l0o ~ l5o dip, easy to operate. Drop-out fuse link press "should be able to ensure that the internal distribution transformer or high and low pressure outlet quickly fuse casing when a short circuit occurs" principle to choose Nanyang Nanyang Teflon transformer maintenance requirements must be met fuse fuse time less than or equal 0.1s; fuse should also consider the mechanical strength requirements, according to the rules of order: 2 to 3 times the capacity of 100kVA and below, the high voltage side of the transformer fuse rated current capacity of rated current selection; capacity of 100kVA or more, High side fuse rated at 1.5 to 2 times the rated current of the transformer capacity choice. Transformer low voltage side of the low pressure side of the fuse by 1.3 times the rated current choice. Teflon power (Figure) _ _ Nanyang Nanyang transformer installed transformer provided by Nanyang Fulong Power Engineering Company Limited. Nanyang Fulong Power Engineering Co., Ltd. (www.nyfulong.com) adhere to the "people-oriented" business philosophy, has a professional staff, and strive to provide the best products and services to contribute to the community, and to welcome new and old customers to visit us, sincere cooperation for a better future. Teflon electricity - your trusted friend, Company Address: Nanyang City Wolong District Po Town Huangshan village, Contact: Dong Zhipeng. |
Admin>>>
You are the 16410 visitor
Copyright © GuangDong ICP No. 10089450, Nanyang Fulong Power Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 16410 visitor
Copyright © GuangDong ICP No. 10089450, Nanyang Fulong Power Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility